by Tim James | Jul 29, 2013 | Blog
In South Africa we operate within the constraints of an energy grid that is under extreme load with very little reserve margin and with the delays of the Medupi power station (expected to be on line H1 2014), Eskom is placing significant emphasis on what it calls...
by Tim James | Apr 15, 2013 | Blog
Corporate PC Power management solutions are the norm in many of the largest organisations on the planet, including one or two in South Africa. Wallmart, ABSA, Boeing, AT&T and Citbank would be to name but a few. It is still staggering however, how many large...